Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1999 LEGISLATIVE REPORT
Active Projects

 47. PROJECT:Highline Ditch
LEVEL:New Application
SPONSOR:Highline Watershed Improvement Ditch
LOCATION:Carbon County
PROGRAM:Rehabilitation

PROJECT INFORMATION:
The project is located east of Saratoga within the proposed Highline Watershed Improvement District. The main problem is the erosion of the three main irrigation ditches through a steep section of the irrigation ditch flow area. Head cut has not stabilized and is working upstream towards a concrete diversion structure. The county has moved the road once because of the danger and may have to move it again. The ditches are 30 plus feet deep and have combined because of the bank erosion.

A large number of irrigated acres are dependent on this water delivery system. This area produces 2 to 3 tons of hay per irrigated acre and also supplies a large amount of forage for spring and fall grazing as well a considerable amount of forage for area wildlife. The irrigation water delivery system is being threatened and a structure such as a pipe-drop is needed to prevent further erosion. Preliminary design work on this has been done in the past.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends that the project be incorporated into the Rehabilitation Program at Level II status with an appropriation of $50,000.