Agency Information
Mission Statement
Directory
Calendar
Commission Agendas & Minutes
Consultant Selection
Items Open for Public Comment
Newsletter
Operating Criteria
Project Application Information
Send Us Your Comments
Planning Program
Dam and Reservoir Planning
Groundwater Grant Projects
Instream Flow Filings
Current Planning Projects
River Basin Planning
Weather Modification Study
Probable Maximum Precipitation
Water Research Projects
Construction Program
Current Construction Projects
Small Water Projects
Agency Publications
Project Reports
Water/Climate Web Atlas
Irrigation & Water System Surveys
Legislative Reports
Water Mgmnt & Conservation Dir
History of Wyoming Water Law
WWDC Home Page
Water Plan Home Page
WRDS Home Page
|
1999 LEGISLATIVE REPORT
Active Projects
72. | PROJECT: | Natrona County Regional Rehabilitation | | | | | |
| LEVEL: | III |
| SPONSOR: | Natrona County Regional Water System Joint Powers Board |
| LOCATION: | Natrona County |
| PROGRAM: | Rehabilitation |
| |
| EXISTING LEGISLATION: |
|
Purpose |
Chapter |
Session |
Account |
Appropriation |
Due Date |
|
|
Level III-I |
206 |
1995 |
II |
$1,500,000* |
1999 |
|
|
Level III-II |
59 |
1996 |
II |
$3,800,000* |
1999 |
|
|
Level III-III |
38 |
1998 |
II |
$57,000* |
2002 |
|
| *50% grant, 50% loan (4%, 30 years) |
PROJECT INFORMATION:
The aggregate population of the entities served by the Natrona County
Regional Water System Joint Powers Board is approximately 60,000
residents. The Level II feasibility study of the Natrona County
Regional Water Supply Project identified $60,000,000 of needed
improvements, of which $37,000,000 would be eligible for WWDC
assistance, and identified a phased approach for completing the project.
Some infrastructure improvements should be completed by 1997 to
facilitate operation of the regional system.
The Level II feasibility study of the Natrona County Regional Water
Supply Project recommended that the Fort Caspar and Dempsey Acres Well
Fields be rehabilitated. The estimated cost for this component of the
project is $4,814,000. The project will be completed in three phases:
drilling, final design, and construction. The well fields are a primary
water supply for the regional system. The existing wells are old and
production has dropped. The project would serve to increase the well
production to its permitted amount. In addition, several water storage
tanks will be operated by the Joint Powers Board. Telemetry
modifications to the tanks and some rehabilitation is required to extend
their usable life. The estimated cost for the improvements to the
storage tanks is $586,000. These project components are eligible for
funding from the Rehabilitation account. Because of limited
funds available, the WWDC recommended that this project be phased.
The first phase of the well rehabilitation project has been constructed.
The second phase is under construction and will be completed in the next
two years. The rehabilitation of the storage tanks is currently under
design. One of the tanks has been identified as needing a new inlet
pipe to help prevent stagnation of the water in the tank.
RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.
|