Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2000 LEGISLATIVE REPORT
Active Projects

 02. PROJECT:Aladdin Water Supply
LEVEL:II-Hold
SPONSOR:Aladdin Community Water District
LOCATION:Crook County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 10 1994 I $25,000 1996
Level II 8 1995 I $275,000 1996
Level II 15 1996 I Hold 1998
Level II 82 1998 I Hold 2000
*A block appropriation of $15,000 was made for all hold projects.

PROJECT INFORMATION:
The WWDC completed a Level I study in 1994 which identified a well site and developed cost estimates which yield monthly rates acceptable to district members. The water district requested that WWDC proceed to Level II to construct a Madison test well and develop conceptual level plans for storage and transmission components.

A Level II study was completed in 1995 wherein a good groundwater supply was located. During the Level II process, the project service area was reduced to only the immediate Aladdin area, which includes fourteen (14) taps. Conceptual level designs and cost estimates were completed for the downsized system. The total Level III project cost was estimated at $335,000, which includes the Level II well costs ($80,000), the transmission system ($235,000), and the distribution and chlorination systems ($20,000). The distribution and chlorination systems are not eligible for WWDC participation.

The district spent two years investigating financing alternatives, and have requested only that the WWDC sell them the well with a 60/40 grant loan split. The interest rate will be 7.25% with a term of 10 years. They plan to obtain the balance of their funding from other sources.

The project will be maintained in state ownership and provisions made to allow sale of water to the district and to the Department of Transportation. Water will be sold to the district for $1.20 per 1000 gallons and to the Department of Transportation for $.50 per 1000 gallons. No appropriation is necessary because the well is already in place. This authorization will allow the state to recoup its investment in the well, and the well will be put to beneficial use.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required