Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2000 LEGISLATIVE REPORT
Active Projects

 05. PROJECT:Bairoil Test Well
LEVEL:II
SPONSOR:Town of Bairoil
LOCATION:Carbon County
PROGRAM:New Development

PROJECT DESCRIPTION:
The town of Bairoil is seeking to expand their groundwater supply by drilling a second production-size test well with similar production and water quality properties to that of the test well emplaced in 1999 by WWDC. The town, in order to sever its dependency on an oil field water supply pipeline (see Bairoil Water Supply above) and provide for future growth and redundancy, wants an additional groundwater source. Favorable criteria for siting the second well would include minimizing the distance for installing transmission and power lines, maximizing the well spacing such that drawdown interference between pumping wells is reduced, and locating optimal aquifer characteristics in the Battle Springs Formation.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated in the New Development Program at Level II with an appropriation of $200,000.

   Citizen    Government    Business    Visitor   Privacy Policy