Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2000 LEGISLATIVE REPORT
Active Projects

 13. PROJECT:Burlington Water Supply
LEVEL:III
SPONSOR:Town of Burlington
LOCATION:Big Horn County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 15 1996 I $75,000   1998
Level III 45 1997 I $360,000* 2000
*60% grant

PROJECT INFORMATION:
There are 77 taps currently serving 195 residents and 279 children enrolled in the school. The town is served by two shallow, alluvial wells. The wells are 35 feet deep and there is about 23 feet of saturated thickness of the alluvium. The water level rises in the summer months. The well is surrounded by a feedlot, buildings, old cars, and farm land which are possible sources of contamination. The residents of Burlington have a relatively new water system and pay an average of $27.00 per month for water service.

In 1996, a Level II report was completed by MSE/HKM. The report noted several deficiencies in the Burlington water system including inadequate chlorination, flow bottlenecks, minimal fire flows, and unprotected shallow alluvial wells. The wells produce abundant, good quality water. However, because they are completed to a depth of only 35' and contain 25' of water, they are vulnerable to surface contamination. The proposed Level III project will:

  1. Implement a well head protection area around the existing wells including purchase of those properties most likely to pose a threat to the wells.

  2. Construct a larger (8") pipeline from the wells to the tank. This will eliminate a serious bottleneck in the system and enable more efficient filling of the existing water storage tank.

  3. Replace the existing pumps in the two production wells with larger capacity units. In conjunction with #2 above, this improvement will enable more efficient filling of the existing water storage tank, provide better water pressure during the irrigation season, and provide a redundant water main into town.

  4. Install a gas chlorination system to replace the existing hypochlorite system. This improvement will enable Burlington to more fully comply with the Safe Drinking Water Act and will reduce corrosion problems in the well house.

  5. Irrigate parks with separate irrigation wells.

These improvements have been estimated to cost $744,200.00. However, the Rural Utilities Service (RUS) will finance $414,200.00 ($364,200.00 grant, $50,000.00 loan at
5 1/8% for 30 years).

Construction of Items 1-4 above is complete. Construction of Item 5 should be completed during the spring of 2000.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.