Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2000 LEGISLATIVE REPORT
Active Projects

 19. PROJECT:Chugwater Water Supply
LEVEL:III
SPONSOR:Town of Chugwater
LOCATION:Platte County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 15 1996 I $75,000     1998
Level II 46 1997 I $100,000     1998
Level III 45 1997 II $103,500*   2000
Level III 16 1999 I $967,800** 2003
*50% grant
**60% grant

PROJECT INFORMATION:
Work completed under the 1997 Level III construction appropriation includes replacement of pipe from the in town wells to the storage tank with larger pipe and rehabilitation of the valves on the storage tank. The 1999 Level III construction appropriation authorizes replacement of one in town well, new pumps, controls and disinfection equipment, new wells and storage tank west of town and a pipeline from those wells to town. The in town well replacement and control building have been designed and should be constructed prior to the summer of 2000. RUS is funding the 40% of this project and 50% of the previous work not funded by the WWDC.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.

   Citizen    Government    Business    Visitor   Privacy Policy