Agency Information
Mission Statement
Directory
Calendar
Commission Agendas & Minutes
Consultant Selection
Items Open for Public Comment
Newsletter
Operating Criteria
Project Application Information
Send Us Your Comments
Planning Program
Dam and Reservoir Planning
Groundwater Grant Projects
Instream Flow Filings
Current Planning Projects
River Basin Planning
Weather Modification Study
Probable Maximum Precipitation
Water Research Projects
Construction Program
Current Construction Projects
Small Water Projects
Agency Publications
Project Reports
Water/Climate Web Atlas
Irrigation & Water System Surveys
Legislative Reports
Water Mgmnt & Conservation Dir
History of Wyoming Water Law
WWDC Home Page
Water Plan Home Page
WRDS Home Page
|
2000 LEGISLATIVE REPORT
Active Projects
19. | PROJECT: | Chugwater Water Supply | | | | | |
| LEVEL: | III |
| SPONSOR: | Town of Chugwater |
| LOCATION: | Platte County |
| PROGRAM: | New Development |
| |
| EXISTING LEGISLATION: |
|
Purpose |
Chapter |
Session |
Account |
Appropriation |
Due Date |
|
|
Level I |
15 |
1996 |
I |
$75,000 |
1998 |
|
|
Level II |
46 |
1997 |
I |
$100,000 |
1998 |
|
|
Level III |
45 |
1997 |
II |
$103,500* |
2000 |
|
|
Level III |
16 |
1999 |
I |
$967,800** |
2003 |
|
| *50% grant |
| **60% grant |
PROJECT INFORMATION:
Work completed under the 1997 Level III construction appropriation includes
replacement of pipe from the in town wells to the storage tank with larger
pipe and rehabilitation of the valves on the storage tank. The 1999 Level
III construction appropriation authorizes replacement of one in town well,
new pumps, controls and disinfection equipment, new wells and storage tank
west of town and a pipeline from those wells to town. The in town well
replacement and control building have been designed and should be constructed
prior to the summer of 2000. RUS is funding the 40% of this project and
50% of the previous work not funded by the WWDC.
RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.
|