Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2000 LEGISLATIVE REPORT
Active Projects

 32. PROJECT:Encampment Water Supply
LEVEL:III
SPONSOR:Town of Encampment
LOCATION:Carbon County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 46 1997 I $45,000   1998
Level III 38 1998 I $137,000* 2001
*60% grant

PROJECT INFORMATION:
The Town of Encampment received a grant appropriation of $137,000 for 60% of the WWDC eligible portion of the project. The remainder of the project is financed by the town from other sources.

The purpose of the project is to connect the raw water irrigation pipe network to the town cemetery. Funding is also provided to connect the town's drinking water system to the Sierra Madre Water and Sewer Joint Powers Board water system. Project components are primarily pipe, valves, and fittings necessary to make the connections functional.

The Town of Encampment has executed the project agreement with the WWDC and hired an engineer for design and inspection services. It is expected that the town will perform the work and provide its share of financing from a capital facilities tax.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is recommended.