Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2000 LEGISLATIVE REPORT
Active Projects

 35. PROJECT:Fayette Irrigation District
LEVEL:II
SPONSOR:Fayette Irrigation District
LOCATION:Sublette County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 81 1999 II $75,000 2000

PROJECT INFORMATION:
The Fayette Irrigation District formed in July, 1998, but the Fayette Ditch is a very old irrigation system. The original appropriations date back to 1906, with the bulk of the adjudicated lands now in a 10 acre minimum lot size subdivision. There is one ranch with approximately 300 acres. There are 2129 acres to be assessed, of which approximately 1000 are currently irrigated. The canal system is in need of rehabilitation, with some lands not able to obtain their water, and severe erosion occurring in sections of the main canal.

The Level II study conducted an inventory of the system, identified needed rehabilitation and improvements, examined the potential for an improved water supply, and prepared conceptual designs and cost estimates for those items.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated in the Rehabilitation Program at Level III, however, the Select Water Committee removed the project from consideration.

   Citizen    Government    Business    Visitor   Privacy Policy