Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2000 LEGISLATIVE REPORT
Active Projects

 36. PROJECT:Gillette Fort Union Well Field
LEVEL:III
SPONSOR:City of Gillette
LOCATION:Campbell County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level III 206 1995 II $550,000* 1999
Level III 59 1996 II $925,000* 1999
Level III 38 1998 II $250,000* 2002
*50% grant

PROJECT INFORMATION:
The City of Gillette has experienced considerable draw down and reduced production in their "in-town" wells tapping the Fort Union and Lance/Fox Hills aquifers. In addition, the city has made major expenditures in rehabilitating wells and replacing pumps. The Gillette Area Master Plan identified the importance of improved management of the multi source Gillette water supply system in order to reduce operation and maintenance costs, maximize production from existing sources, protect the long term yield of the Fort Union formation, and insure uniformity of water quality available to Gillette water users through blending of supply sources.

The 1994 project activities included pump testing and logging of existing wells, analysis of the operation and maintenance procedures for both the in-town wells and the Madison well field, and a review of overall system configuration. The 1994 study established a schedule for rehabilitating Gillette's existing Fort Union well field, for developing maximum production from the Madison well field (included as a Level III recommendation in the 1995 New Development Program), and eventually for a new Fort Union well field.

In 1995, the design for the replacement of two wells was completed and an existing well was rehabilitated. In 1996 two wells were drilled and the design of a supply pipeline was initiated. In 1997 two additional wells were replaced and the supply pipeline was designed. In 1998 the final three wells were completed and construction of the supply pipeline was completed.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action required.

   Citizen    Government    Business    Visitor   Privacy Policy