Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2000 LEGISLATIVE REPORT
Active Projects

 39. PROJECT:Glenrock Raw Water Irrigation
LEVEL:II
SPONSOR:Town of Glenrock
LOCATION:Converse County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 82 1998 I $75,000 2000

PROJECT INFORMATION:
The Glenrock water system serves a population of about 3,000 people. There are 1042 active taps. Water rates are $9.00 for the first 3000 gallons, $1.00/1000 gallons thereafter and water bills average $28.00 per month.

The proposed Level II study was to 1) determine water supply needs, 2) inventory and assess the transfer of surface and groundwater rights to best benefit the town in their pursuit of raw water irrigation system development, 3) evaluate water quality and the condition of the wells, 4) evaluate the suitability of irrigating with groundwater from the Park well, the South Recreation Complex well, the Deer Creek well, the AML well, and Deer Creek surface water, 5) develop water supply options, 6) complete preliminary designs and cost estimates for the water supply options, and 7) complete an economic study and ability to pay analysis, determine permitting and environmental constraints.

Sunrise Engineering was contracted to perform the analysis. The Level II study determined that the most economical solution to the Town of Glenrock's water supply problems was to increase the potable water supply rather than to try to establish a raw water system. The engineer recommended that a Casper formation test well be drilled to attempt to locate an added groundwater supply source.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.

   Citizen    Government    Business    Visitor   Privacy Policy