Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2000 LEGISLATIVE REPORT
Active Projects

 56. PROJECT:Kaycee Master Plan
LEVEL:I
SPONSOR:Town of Kaycee
LOCATION:Johnson County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 82 1998 I $40,000 2000

PROJECT INFORMATION:
The sponsor has received approximately 45 requests for domestic water service from areas immediately surrounding their existing service area. To aid in planning for a potential system expansion they have requested WWDC to prepare a Level I Water System Master Plan. They anticipate extension of their main water lines to the north, south, and east, and additional storage to meet these potential demands.

The WWDC contracted with Grizzly Engineering in Buffalo Wyoming to conduct the Level I master plan. The master plan was completed during 1999. The sponsor is considering its options.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.