Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2000 LEGISLATIVE REPORT
Active Projects

 62. PROJECT:Laramie Rehabilitation
LEVEL:III
SPONSOR:City of Laramie
LOCATION:Albany County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 10 1994 I $200,000   1996
Level III 206 1995 II $550,000* 1999
Level III 59 1996 II $1,200,000* 1999
*50% grant, 50% loan (4%, 20 years)

PROJECT INFORMATION:
The 1994 Master Plan study evaluated various options for expanding Laramie's water supply, storage, treatment, transmission and distribution system to meet expanding demands. The study recommended a long-term schedule for improving both the surface and groundwater supply systems. In 1995 recommendations for Level III construction funding were made from both the New Development and Rehabilitation accounts.

The 1995 rehabilitation appropriation addressed rehabilitation of an existing storage facility and Soldier Springs. The storage facility rehabilitation is now complete and the replacement well at Soldier Springs was drilled in 1997. Also in 1997 design was completed on the replacement of portions of the water supply pipeline between the water treatment plant and the city, replacement of a portion of the raw water pipeline between Sodergreen Lake and the water treatment plant, and a new pumphouse for the Soldiers Springs replacement well. All three projects are essentially complete with only clean up work and resolution of electrical interference with the town of Walden, Colorado remaining.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.