Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2000 LEGISLATIVE REPORT
Active Projects

 69. PROJECT:Manville Water Supply
LEVEL:III
SPONSOR:Town of Manville
LOCATION:Niobrara County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level III 38 1998 I $69,000 2001

PROJECT INFORMATION:
The town is presently served by two wells about 200 feet deep into the Arikaree Formation. The wells are 70 years old, located only about 30 feet apart in the same building. The town recently completed renovation of their 25,000 gallon storage tank using Farm Loan Board funds, and has diligently maintained the distribution portion of their system. In 1996, the Commission recommended that the project be incorporated into the New Development Program at Level II with a budget of $200,000. This Level II project consisted of a well siting study, construction and testing of production-sized well, and conceptual plans and cost estimates for converting the test well to production status and connecting the new well to the town's existing distribution system.

The well was successfully completed, and converted to a production well.

The remainder of the project is to complete the piping from the new well to the town's storage tank, modernize the control building, and install associated controls. Bids were opened in the fall of 1998. Project is essentially complete with only minor work items remaining.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action required.