Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2000 LEGISLATIVE REPORT
Active Projects

 70. PROJECT:McNutt Water Supply
LEVEL:III
SPONSOR:McNutt Improvement District
LOCATION:Washakie County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 82 1998 I $25,000 2000

PROJECT INFORMATION:
The City of Worland installed a new water line to the Boy's School two years ago that passes very near to the sponsor's service area. At the time that line was constructed, the city installed a tap to accommodate the sponsor's future plans for a water system.

The sponsor has requested assistance to complete a rural water system for their subdivision. A Level II study was performed in 1998 which shows the project to be feasible, and monthly water bills will be approximately $50/tap/month. The total project cost is estimated at $165,000, with $102,000 of that amount eligible for WWDC participation The sponsor has requested a 60/40 grant loan split, and 7.25% financing for 30 years.

There are currently about 45 people living in the service area, with a number of unoccupied lots. They predict there will be 20 taps on their system initially, and are confident that additional requests will be made for taps once the system moves forward. The sponsor currently utilizes individual wells of marginal quality, and septic systems.

The project has been incorporated into the Washakie Rural Water Supply Project, and advanced to Level III in the New Development Program with an appropriation of $60,000 as part of the appropriation for the Washakie Rural Water Supply Project.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.

   Citizen    Government    Business    Visitor   Privacy Policy