Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2000 LEGISLATIVE REPORT
Active Projects

 72. PROJECT:Middle Fork Dam
LEVEL:II-Hold
SPONSOR:State of Wyoming
LOCATION:Johnson County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 10 1994 I Hold   1996
Level II 15 1996 I Hold   1998
Level II 82 1998 I Hold* 2000
*A block appropriation of $15,000 was made for all hold projects

PROJECT INFORMATION:
The proposed project would be located on the Middle Fork of the Powder River. The Middle Fork Reservoir would have a total capacity of 59,600 acre-feet, of which 47,700 acre-feet would be active storage for water supply and the remaining 11,900 acre-feet would be for the purposes of fisheries and recreation (minimum pool). The project would yield 32,200 acre-feet per year for industrial, agricultural and instream flow purposes. The project would cost approximately $55,000,000. In 1990, WWDC completed negotiations to obtain an interest in the reservoir permits from the Powder River Reservoir Corporation (PRRC). The transfer required a separate contract between EXXON U.S.A. and WWDC. EXXON has invested about 1.5 million dollars in the project and has a contract with the PRRC which had to be addressed before the state can proceed toward construction of the project. The Commission contracted with the USGS for a study of water quality parameters in the Powder River drainage. This report was completed in 1992.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends that the project be retained at Level II-Hold status.

   Citizen    Government    Business    Visitor   Privacy Policy