Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2000 LEGISLATIVE REPORT
Active Projects

 78. PROJECT:North Alpine Junction Water Supply
LEVEL:II-Hold
SPONSOR:Lincoln County Commissioners/Town of Alpine
LOCATION:Lincoln County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 8 1995 I $35,000   1996
Level II 15 1996 I Hold   1998
Level II 82 1998 I Hold* 2000
*A block appropriation of $15,000 was made for all hold projects

PROJECT INFORMATION:
The project would serve 450 residents with 230 taps in the unincorporated area north of the Snake River. The current Alpine Water Supply project is currently involved with approximately the same number of residents and taps in the incorporated area south of the river. The Lincoln County Commissioners, as well as the Town of Alpine, are concerned about the rapid development in the Alpine Junction area. They would like to develop a master plan for water (and sewer) service to serve the region including the residents of the areas north and south of the Snake River. The Town of Alpine is also considering regionalization of the area and had a connecting pipeline placed in the plans of the new Snake River Bridge when it was constructed in the summer of 1995.

The applicants would like to drill a test well in the north area around the Port of Entry and also do some pump testing in that area. They would also like to complete additional population growth projections and reevaluate the land ownership in the Alpine area. Due to the rapid growth and changing of land ownership in the area, it will be hard to determine the service area and district boundaries for this project at the present time. Therefore, it is recommended to place this project in the hold category until a district is formed. After a district is formed, the project will be eligible for Level II funding.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends that the project be retained at Level II-Hold status.