Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2000 LEGISLATIVE REPORT
Active Projects

 80. PROJECT:North End Water Supply
LEVEL:I
SPONSOR:North End Water Users
LOCATION:Park County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 82 1998 I $50,000 2000

PROJECT INFORMATION:
The water supply system for the North End Water Users was constructed in 1964 and supplies water to 205 taps north of Powell. The system has experienced considerable growth over the years and is experiencing difficulty meeting demands. The potential to connect to the Big Horn Basin Rural project has been suggested. The area presently depends on wells in the southern portion of their service area. The study will determine the required facility expansion, prepare preliminary designs and cost estimates and prepare the project reports.

The Level I analysis has been completed and the sponsor is reviewing its options.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.