Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2000 LEGISLATIVE REPORT
Active Projects

 91. PROJECT:Rock River Transmission Pipeline
LEVEL:III
SPONSOR:Town of Rock River
LOCATION:Albany County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level III 59 1996 II $670,000* 1999
*50% grant, balance of project cost from capital facilities tax

PROJECT INFORMATION:
In 1998 the Town of Rock River received a Level III grant in the amount of $670,000 from Water Development Account II. The grant is for 50% of the WWDC eligible project costs with the balance of the project to be financed with proceeds from a 1998 Albany County capital facilities tax.

The Level III project includes the replacement of the final five miles of a 14.2 mile transmission pipeline and the enlargement of the town's infiltration gallery on Rock Creek. The enlargement of the infiltration gallery will reduce the need for frequent backwashing during high turbidity periods, saving the town considerable costs associated with operations and maintenance, while increasing the quality of water being delivered to the water treatment plant. The transmission line replacement will complete the replacement project which the town began in the 1980's to ensure a more dependable source of water supply.

Construction of the transmission line replacement is essentially complete. Final project cleanup and route restoration will be accomplished in the fall of 1999. Design of the infiltration gallery and intake modifications has been complete with construction of the improvements to be started in the spring of 2000 and completed by October 2000.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required for this project.