Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2001 LEGISLATIVE REPORT
Active Projects

 93. PROJECT:Riverton East
LEVEL:Level II
SPONSOR:State/Tribes
LOCATION:Fremont County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 36 2000 I $125,000 2002

PROJECT INFORMATION:
The Tribes were awarded water to irrigate the Riverton East Project in Fremont County east of the city of Riverton and east of the Wind River. The project is to irrigate about 3900 to 4000 acres of unirrigated range land. The project will review the studies done to date and will determine the feasibility of irrigating the area by means of sprinkler irrigation from the Wind River and/or Little Wind River. The study will also evaluate the potential of using alternate means to power the pumps, such as natural gas. The study is scheduled to be completed in the fall of 2001.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC is recommending that the project remain at Level II and no legislative action is necessary.

   Citizen    Government    Business    Visitor   Privacy Policy