Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2002 LEGISLATIVE REPORT
Active Projects

 49. PROJECT:Green River Supply Canal
LEVEL:New Application
SPONSOR:Green River Irrigation District
LOCATION:Sublette County
PROGRAM:Rehabilitation

PROJECT INFORMATION:
The Green River Canal has been in operation for many years and delivers water to irrigators with water rights that date back to the early 1900's. Water is delivered to 5,830 acres from Cotton Wood Creek and the Green River. Currently the canal is unable to carry its entire water right of 84 cfs. The canal suffers from delivery, conveyance, erosion and seepage problems. The primary diversion is from the Poole Slough off of the Green River. The condition of Poole Slough diversion has deteriorated to the point that it is hazardous to operate. Additionally, the Green River Canal water is transported through Cottonwood Creek. It is believed that there are significant losses suffered through this stretch of the canal. Due to the length of the canal this would have to be a two year study focusing on solutions to the problems facing the Green River Canal Irrigators.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated into the Rehabilitation Program at Level II with an appropriation of $200,000.

   Citizen    Government    Business    Visitor   Privacy Policy