Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2002 LEGISLATIVE REPORT
Active Projects

 57. PROJECT:Hidden Valley
LEVEL:New Application
SPONSOR:Midvale Irrigation District
LOCATION:Fremont
PROGRAM:Rehabilitation

PROJECT INFORMATION:
The Midvale Irrigation District would like to convert approximately 7 miles of an open, unlined canal known as the Pilot Canal, into a gravity-pressurized pipeline serving the Hidden Valley area. Hidden Valley is located along the Wind River at the top end of Boysen Reservoir. The proposed system would include a small earthfill dam and regulation reservoir in the natural drainage below P36.8 wasteway.

When full the reservoir would provide a 2 « day supply for Hidden Valley under full demand. The gravity pressurized system would serve approximately 2,200 acres and would conserve an estimated 13,000 acre-feet of water once flood irrigation is converted to sprinkler irrigation and conveyance efficiencies are increased.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated into the Rehabilitation Program at Level II with an appropriation of $100,000.

   Citizen    Government    Business    Visitor   Privacy Policy