Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2002 LEGISLATIVE REPORT
Active Projects

 94. PROJECT:Pine Haven Pipeline Rehabilitation
LEVEL:III
SPONSOR:Town of Pine Haven
LOCATION:Crook County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 36 2000 I $35,000 2002
Level III 2 2001 II $235,000 2005

PROJECT DESCRIPTION:
The town of Pine Haven Water System Master Plan, completed in November of 2000 by Stetson Engineering for WWDC, suggested several possible system expansion alternatives. With WWDC funding assistance, the town wishes to pursue two Level III considerations, 1) a 6" pipeline to tie the existing Keyhole No. 1 Well directly to the town's .25MG storage tank, and 2) an 8" "tank tie-in" transmission line from the storage tank to the town's distribution system to enhance the system reliability/redundancy and to provide looping from the storage facility.

The project has been designed and construction is anticipated in 2002, with project completion by the end of the calendar year.

RECOMMENDED LEGISLATIVE ACTION: