Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2002 LEGISLATIVE REPORT
Active Projects

106.PROJECT:Salt Creek Water Supply
LEVEL:III
SPONSOR:Salt Creek Water District
LOCATION:Weston County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 15 1996 I $100,000   1998
Level II 46 1997 I $500,000   2000
Level II 82 1998 I $140,000   2000
Level II 81 1999 I $420,000   2000
Level III 96 2000 I $690,000* 2004
*60% grant, 40% loan (7.25%, 30 years)

PROJECT INFORMATION:
Salt Creek Water District wishes to make improvements to their existing system as well as join in a regional, Newcastle area system which was evaluated in the 1999 Level II study. This project includes the district's purchase of the SCWD No. 1 Well drilled by WWDC in 1999 with directional drilling technology and completed in the Madison formation aquifer.

The Level III appropriation will finance pump, plumbing, and controls to connect the SCWD No. 1 Well into the district's water delivery system. The appropriation will also finance construction of a pipeline to connect the well and to replace old transmission pipe.

Construction is underway on the well appurtenances and control building. Design is complete on the transmission pipeline, with construction and completion of the project anticipated in 2002.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.