Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2002 LEGISLATIVE REPORT
Active Projects

136.PROJECT:Wheatland Water Supply
LEVEL:III
SPONSOR:Town of Wheatland
LOCATION:Platte County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level III 2 2001 I $222,000 2005

PROJECT INFORMATION:
This project would provide funding for the design and construction of a new well, new storage, and pipeline to connect the improvements to the town of Wheatland's system. The improvements would provide additional supply to the southwest portion of town. This area includes a new school that can not be used until sufficient water supply in the area is available.

The project has been included at Level III status in the Rehabilitation Program with an appropriation of $222,000. The total project budget is estimated to be $854,000. The financing plan is a 26% grant, $222,000, and 74% of the project budget being secured by the sponsor through other sources.

Plans have been prepared and construction of the water storage tank has begun. Plans have been prepared for the pressure reducing vaults and construction is expected to begin early in 2002.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.