Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2003 LEGISLATIVE REPORT
Active Projects

 12. PROJECT:Big Piney Water Supply
LEVEL:II
SPONSOR:Town of Big Piney, Incorporated Municipality
LOCATION:Sublette County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
II 10 1994 I $200,000 1996
III 206 1995 I $410,000 1999
III 59 1996 I $590,000 1999

PROJECT INFORMATION:
The 1994 WWDC Level II Study for Big Piney/Marbleton recommended upgrades for Big Piney, including those that are being requested in this project. These upgrades are designed to increase system reliability, improve public health and safety, provide emergency and fire suppression water, and increase overall system operating efficiency. As a small town with limited resources and a stable population, Big Piney has worked since 1994 to develop priorities for improvements that will achieve the most value. The proposed improvements include a new 200,000 gallon elevated storage tank, updated well system controls, conversion to liquid chlorination (not WWDC eligible - treatment), a new supply well, and a transmission line connecting the Big Piney and Marbleton water supply systems.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated into the Rehabilitation Program at Level III with an appropriation of $475,000 (50% Grant).