Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2003 LEGISLATIVE REPORT
Active Projects

 22. PROJECT:Casper Zone 2
LEVEL:Level III
SPONSOR:City of Casper
LOCATION:Natrona County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 86 2001 I $60,000 2002
Level III 88 2002 I $3,188,000 2007

PROJECT INFORMATION:
Due to the rapid growth in the East Zone II area of Casper, the city would like to expand its storage and transmission facilities that serve the area. There have been two studies in the past in this area. However, rapid growth has changed the demands since that time. Civil Engineering Professional Inc. were retained to conduct the Level II analysis of the project. The study identified numerous infrastructure improvements that should be made by the City. The City has selected a development plan that includes new pipelines and storage facilities in the Eastern part of the City.

Design and construction of the project will proceed during 2003.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action required.

   Citizen    Government    Business    Visitor   Privacy Policy