Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2003 LEGISLATIVE REPORT
Active Projects

 25. PROJECT:Cheyenne Raw Water Supply #2
LEVEL:III
SPONSOR:City of Cheyenne
LOCATION:Laramie County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 8 1995 II $250,000 1996
Level III 45 1997 II $1,800,000 2000

PROJECT INFORMATION:
The 1997 Legislature authorized WWDC funding in the amount of $1,800,000 (50% grant, 50% loan) to construct the first phase of a raw (untreated) water system to economically provide irrigation for parks, golf courses, cemeteries and recreational fields in the city. Under the first phase, an existing 16-inch water main was converted from transmitting treated water to conveying raw water for irrigation use at Lion's Park and at three 18-hole golf courses located in the northwest part of the city. This phase of the project resulted in a 3 million gallons per day (mgd) reduction in peak day demands for treated water.

Phase II of the project will extend the raw water system from the Sloans Lake/Lions Park area further east, across the municipal airport to the Prairie View Golf Course area. This would enable the system to serve the four cemeteries south of the airport, the Morrie Avenue/Airport parkways, the Veterans Administration grounds, East High School grounds and athletic fields, two softball field complexes, the golf course, two baseball field complexes and two soccer field complexes. The irrigated lands served would be approximately 200 acres resulting in another 1.5 to 2.0 mgd savings in peak day treated water demands. A 1996 States West Water Resources Level II Water Supply Study indicates that each 1 mgd in reduced water treatment capacity saves approximately $1.3 million in capital costs plus a significant reduction in yearly operation and maintenance costs.

Timing of this project is critical since the new pipeline will run across Cheyenne Airport property and should coincide with current airport plans to relocate the main runway. The City of Cheyenne has requested a $5,000,000 appropriation to design and construct Phase II of the raw water irrigation system.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated into the New Development Program at Level III with an appropriation of $5,000,000. The financing plan would be a 50% grant ($2,500,000), and a 50% loan ($2,500,000), at an interest rate of 6% for a term of 30 years.