Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2003 LEGISLATIVE REPORT
Active Projects

 56. PROJECT:Hanover Repair
LEVEL:New Application
SPONSOR:Hanover Irrigation District
LOCATION:Washakie County
PROGRAM:Rehabilitation

PROJECT INFORMATION:
The proposed project will rehabilitate a steel flume that was lined in the 1990's under a project financed with water development funds. The lining is deteriorating. The proposed project will serve to help assure delivery of water to the irrigators below the flume.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated in the Rehabilitation Program at Level III with an appropriation of $87,000. The financing plan has two options, with the irrigation district selecting its preferred option prior to beginning construction. Funding option one is a 50% grant, 50% loan, which is amortized over thirty years at 6.00% interest. Funding option two is a grant of $43,500 for 100% of materials with the district responsible for the balance of project expenses.