Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2003 LEGISLATIVE REPORT
Active Projects

 72. PROJECT:LeClair Laterals
LEVEL:II
SPONSOR:LeClair Irrigation District
LOCATION:Fremont County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 7 2002 II $50,000 2004

PROJECT INFORMATION:
The LeClair Irrigation District would like to rehabilitate a number of their laterals in an effort to continue their conservation program as outlined initially in the WWDC Level I Report: Wind River Study: LeClair Canal and Riverton Valley (Wyoming No. 2 Canal Rehabilitation), March 1993. The study suggested piping of open-ditch laterals in a phased approach, allowing the District to implement improvements in a prioritized sequence. A subsequent 1994 Level III project began the process of installing the pipe, with WWDC financing the cost of materials and the district providing the labor for installation. Easement and access issues significantly slowed the progress of installation of pipe by the district. The district believes that it has now resolved these issues. A Level II engineering study was recently completed to update project costs from the 1993 study and to include seven additional laterals. This 2002 study recommended the installation of pipe in twelve open laterals and provided a revised estimate for rehabilitation costs totaling $1,130,000.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends that the project be incorporated in the Rehabilitation program at Level III with an appropriation of $565,000, which equates to a 50% grant to be used for the purchase of materials. 50% sponsor funding will come from in-kind construction, engineering design, construction engineering, permitting, easements and installation.

   Citizen    Government    Business    Visitor   Privacy Policy