Agency Information
Mission Statement
Directory
Calendar
Commission Agendas & Minutes
Consultant Selection
Items Open for Public Comment
Newsletter
Operating Criteria
Project Application Information
Send Us Your Comments
Planning Program
Dam and Reservoir Planning
Groundwater Grant Projects
Instream Flow Filings
Current Planning Projects
River Basin Planning
Weather Modification Study
Probable Maximum Precipitation
Water Research Projects
Construction Program
Current Construction Projects
Small Water Projects
Agency Publications
Project Reports
Water/Climate Web Atlas
Irrigation & Water System Surveys
Legislative Reports
Water Mgmnt & Conservation Dir
History of Wyoming Water Law
WWDC Home Page
Water Plan Home Page
WRDS Home Page
|
2003 LEGISLATIVE REPORT
Active Projects
97. | PROJECT: | Pine Haven Pipeline Rehabilitation | | | | | |
| LEVEL: | III |
| SPONSOR: | Town of Pine Haven |
| LOCATION: | Crook County |
| PROGRAM: | Rehabilitation |
| |
| EXISTING LEGISLATION: |
|
Purpose |
Chapter |
Session |
Account |
Appropriation |
Due Date |
|
|
Level I |
36 |
2000 |
I |
$35,000 |
2002 |
|
|
Level III |
2 |
2001 |
II |
$235,000 |
2005 |
|
PROJECT DESCRIPTION:
The Town of Pine Haven Water System Master Plan, completed in November of 2000 by Stetson
Engineering for WWDC, suggested several possible system expansion alternatives. With
WWDC funding assistance provided by the legislature, the town is pursuing two Level III
considerations, 1) a 6" pipeline to tie the existing Keyhole No. 1 Well directly to the town's
.25 MG storage tank, and 2) an 8" "tank tie-in" transmission line from the storage tank to the
town's distribution system to enhance the system reliability/redundancy and to provide looping
from the storage facility.
The project has been designed and construction is anticipated in 2002, with project completion by
in the Spring of 2003.
RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.
|