Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2003 LEGISLATIVE REPORT
Active Projects

103.PROJECT:Rafter J Rehabilitation
LEVEL:New Application
SPONSOR:Rafter J Improvement and Service District and Teton County
LOCATION:Teton County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 46 1997 II $ 60,000 1998

PROJECT INFORMATION:
The Rafter J Improvement and Service District has a population of approximately 2,500 people. The community has a water supply system supplied by two wells and a 200,000 gallon storage tank. The system serves 500 homes and 25 commercial taps. The system was originally designed to include three wells and an additional tank. The existing system in inadequate and cannot met demands during the summer. The district would like to drill another well and provide additional storage.

The Community formed their district in 1998, and a Level II evaluation was completed project. The Level III funding request was rejected by the Select Water Committee in 1998.

The updated project cost estimate is as follows:

Estimated Level III
Phase 1 Costs:Design, Surveying, Permitting, Easements, Legal$ 64,000
Estimated Level III
Phase 2 Costs:Well$ 69,000
Pipeline$ 62,000
Wellhouse including connection and controls$205,000
Storage Tank improvements$ 16,000
Subtotal$352,000
Engineering (10%)$ 35,200
Contingency (15%)$ 58,000
Total Construction Costs$445,200
Total Project Costs$509,200
   Rounded$510,000

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends that the legislature provide an appropriation from water account II to construct the project. The appropriation should be comprised of 50% grant funding and 50% loan funding. The interest rate for the loan is 6% for a term of 30 years.