Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2003 LEGISLATIVE REPORT
Active Projects

136.PROJECT:Wheatland - Black Mountain Water Supply
LEVEL:III
SPONSOR:Town of Wheatland
LOCATION:Platte County
PROGRAM:New Development

PROJECT INFORMATION:
The Platte County School District No. 1 is building a new middle school complex in the Black Mountain Village area (west of Interstate Highway I-25) in the Town of Wheatland. The West Elementary School is also located in the area. This section of the Town's water system was incapable of meeting the total water supply and fire supply requirements without major improvements. The Town seeks to eliminate this problem by constructing the project in three phases. The 2001 Legislature authorized WWDC grant funding in the amount of $222,000 to construct the first two phases of the project that included a 1 million gallon storage tank, valves, pressure controls and necessary connecting piping to connect the new storage and well to their water system.

The Town requested a 50% grant for financial assistance with the final phase of the project, which includes completion of a third well in the Black Mountain Village area, system connection piping, a pump house and a disinfection system. Total project costs are estimated to be $200,000.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated in the New Development Program at Level III with an appropriation of $100,000. The financing plan is for a 50% grant of $100,000.

   Citizen    Government    Business    Visitor   Privacy Policy