Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1996 LEGISLATIVE REPORT
Project Reports

 79. PROJECT:Spring Draw Canal
LEVEL:New Application
SPONSOR:Spring Draw Ditch Company
LOCATION:Sheridan County
PROGRAM:Rehabilitation

PROJECT INFORMATION:
The existing ditch and pipeline system serve 562 acres and 16 operators. Each irrigated acre is equivalent to one share in the district. Two users have 330 shares, the five largest users have 80% of the acreage. The present assessment is $10 per share per year. A prefeasibility study prepared at the company's expense estimated the total cost of rehabilitation at about $210,000 to replace the main ditch and laterals serving more than one user with pipelines. The ditch company has about 17,500 feet of ditch and pipeline in deteriorating condition. The company wants to replace the open ditch with a pressurized pipeline, which will eliminate pumping to pressurize sprinklers. The recommended appropriation will fund a study to refine the prefeasibility work, develop accurate cost estimates and financing plans for the replacement of various system components.

RECOMMENDED LEGISLATIVE ACTION:
The Commission recommends that the project be incorporated into the Rehabilitation Program at Level II status with a budget of $35,000.