Agency Information
Mission Statement
Directory
Calendar
Commission Agendas & Minutes
Consultant Selection
Items Open for Public Comment
Newsletter
Operating Criteria
Project Application Information
Send Us Your Comments
Planning Program
Dam and Reservoir Planning
Groundwater Grant Projects
Instream Flow Filings
Current Planning Projects
River Basin Planning
Weather Modification Study
Probable Maximum Precipitation
Water Research Projects
Construction Program
Current Construction Projects
Small Water Projects
Agency Publications
Project Reports
Water/Climate Web Atlas
Irrigation & Water System Surveys
Legislative Reports
Water Mgmnt & Conservation Dir
History of Wyoming Water Law
WWDC Home Page
Water Plan Home Page
WRDS Home Page
|
1996 LEGISLATIVE REPORT
Project Reports
79. | PROJECT: | Spring Draw Canal | | | | | |
| LEVEL: | New Application |
| SPONSOR: | Spring Draw Ditch Company |
| LOCATION: | Sheridan County |
| PROGRAM: | Rehabilitation |
PROJECT INFORMATION:
The existing ditch and pipeline system serve 562 acres and 16 operators.
Each irrigated acre is equivalent to one share in the district. Two
users have 330 shares, the five largest users have 80% of the acreage.
The present assessment is $10 per share per year. A prefeasibility
study prepared at the company's expense estimated the total cost of
rehabilitation at about $210,000 to replace the main ditch and laterals
serving more than one user with pipelines. The ditch company has about
17,500 feet of ditch and pipeline in deteriorating condition. The
company wants to replace the open ditch with a pressurized pipeline,
which will eliminate pumping to pressurize sprinklers. The recommended
appropriation will fund a study to refine the prefeasibility work,
develop accurate cost estimates and financing plans for the replacement
of various system components.
RECOMMENDED LEGISLATIVE ACTION:
The Commission recommends that the project be incorporated into the
Rehabilitation Program at Level II status with a budget of $35,000.
|