PROJECT INFORMATION:
The town of Granger would like to pursue a level II study as recommended in the Level I study
completed in 2000. The level II study will evaluate the possibility of renegotiating a long term use
contract with FMC. This new agreement should allow for Granger's permanent use of the pipeline
while still allowing FMC to shut off the pipeline for maintenance. Additional negotiations should
also be conducted with Little America which would allow for emergency use of Little America's
water intake facility located on the Ham's Fork.
The Level I study also indicated that there are leaks within the distribution system, the Level II
study will conduct leak testing to determine the location and amount of any leaks within the
distribution system.
Cost analysis of additional pipeline to increase pressures for fire flows and to meet DEQ standards
should also be conducted.
RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated into the Rehabilitation Program at Level II
with an appropriation of $65,000.