Agency Information
Mission Statement
Directory
Calendar
Commission Agendas & Minutes
Consultant Selection
Items Open for Public Comment
Newsletter
Operating Criteria
Project Application Information
Send Us Your Comments
Planning Program
Dam and Reservoir Planning
Groundwater Grant Projects
Instream Flow Filings
Current Planning Projects
River Basin Planning
Weather Modification Study
Probable Maximum Precipitation
Water Research Projects
Construction Program
Current Construction Projects
Small Water Projects
Agency Publications
Project Reports
Water/Climate Web Atlas
Irrigation & Water System Surveys
Legislative Reports
Water Mgmnt & Conservation Dir
History of Wyoming Water Law
WWDC Home Page
Water Plan Home Page
WRDS Home Page
|
2001 LEGISLATIVE REPORT
Active Projects
121. | PROJECT: | Wheatland Irrigation District Laramie River Diversion | | | | | |
| LEVEL: | III |
| SPONSOR: | Wheatland Irrigation District |
| LOCATION: | Albany and Platte Counties |
| PROGRAM: | Rehabilitation |
| |
| EXISTING LEGISLATION: |
|
Purpose |
Chapter |
Session |
Account |
Appropriation |
Due Date |
|
|
Level II |
8 |
1995 |
II |
$100,000 |
1996 |
|
|
Level III |
45 |
1997 |
II |
$315,000* |
2000 |
|
|
Level III |
16 |
1999 |
II |
$141,500* |
2000 |
|
| *50% grant, 50% loan (4%, 20 years) |
PROJECT INFORMATION:
The Wheatland Irrigation District received Level III funding for construction of a headsail,
measuring device, and control gates for the headgates from the Laramie River into the tunnel for
Bluegrass Creek. A portion of the funding was used to finance installation of telemetry
communication equipment. This equipment enables the district to monitor and/or operate system
components at their office in Wheatland. Construction of the headsail and water control works is
complete. Installation of the telemetry equipment should be complete prior to the 2001 irrigation
season.
RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.
|