Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2003 LEGISLATIVE REPORT
Active Projects

 72. PROJECT:LeClair Laterals
LEVEL:II
SPONSOR:LeClair Irrigation District
LOCATION:Fremont County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 7 2002 II $50,000 2004

PROJECT INFORMATION:
The LeClair Irrigation District would like to rehabilitate a number of their laterals in an effort to continue their conservation program as outlined initially in the WWDC Level I Report: Wind River Study: LeClair Canal and Riverton Valley (Wyoming No. 2 Canal Rehabilitation), March 1993. The study suggested piping of open-ditch laterals in a phased approach, allowing the District to implement improvements in a prioritized sequence. A subsequent 1994 Level III project began the process of installing the pipe, with WWDC financing the cost of materials and the district providing the labor for installation. Easement and access issues significantly slowed the progress of installation of pipe by the district. The district believes that it has now resolved these issues. A Level II engineering study was recently completed to update project costs from the 1993 study and to include seven additional laterals. This 2002 study recommended the installation of pipe in twelve open laterals and provided a revised estimate for rehabilitation costs totaling $1,130,000.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends that the project be incorporated in the Rehabilitation program at Level III with an appropriation of $565,000, which equates to a 50% grant to be used for the purchase of materials. 50% sponsor funding will come from in-kind construction, engineering design, construction engineering, permitting, easements and installation.