Agency Information
Mission Statement
Directory
Calendar
Commission Agendas & Minutes
Consultant Selection
Items Open for Public Comment
Newsletter
Operating Criteria
Project Application Information
Send Us Your Comments
Planning Program
Dam and Reservoir Planning
Groundwater Grant Projects
Instream Flow Filings
Current Planning Projects
River Basin Planning
Weather Modification Study
Probable Maximum Precipitation
Water Research Projects
Construction Program
Current Construction Projects
Small Water Projects
Agency Publications
Project Reports
Water/Climate Web Atlas
Irrigation & Water System Surveys
Legislative Reports
Water Mgmnt & Conservation Dir
History of Wyoming Water Law
WWDC Home Page
Water Plan Home Page
WRDS Home Page
|
2003 LEGISLATIVE REPORT
Active Projects
72. | PROJECT: | LeClair Laterals | | | | | |
| LEVEL: | II |
| SPONSOR: | LeClair Irrigation District |
| LOCATION: | Fremont County |
| PROGRAM: | Rehabilitation |
| |
| EXISTING LEGISLATION: |
|
Purpose |
Chapter |
Session |
Account |
Appropriation |
Due Date |
|
|
Level II |
7 |
2002 |
II |
$50,000 |
2004 |
|
PROJECT INFORMATION:
The LeClair Irrigation District would like to rehabilitate a number of their laterals in an effort to
continue their conservation program as outlined initially in the WWDC Level I Report: Wind
River Study: LeClair Canal and Riverton Valley (Wyoming No. 2 Canal Rehabilitation), March
1993. The study suggested piping of open-ditch laterals in a phased approach, allowing the
District to implement improvements in a prioritized sequence. A subsequent 1994 Level III
project began the process of installing the pipe, with WWDC financing the cost of materials and
the district providing the labor for installation. Easement and access issues significantly slowed
the progress of installation of pipe by the district. The district believes that it has now resolved
these issues. A Level II engineering study was recently completed to update project costs from
the 1993 study and to include seven additional laterals. This 2002 study recommended the
installation of pipe in twelve open laterals and provided a revised estimate for rehabilitation costs
totaling $1,130,000.
RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends that the project be incorporated in the Rehabilitation program at Level
III with an appropriation of $565,000, which equates to a 50% grant to be used for the purchase
of materials. 50% sponsor funding will come from in-kind construction, engineering design,
construction engineering, permitting, easements and installation.
|