Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2003 LEGISLATIVE REPORT
Active Projects

115.PROJECT:Shoshone Drop Structures
LEVEL:III
SPONSOR:Shoshone Irrigation District
LOCATION:Park
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level III 88 2002 II $570,000* 2007
*100% grant for invoiced materials. The sponsor is responsible for all other project costs.

PROJECT INFORMATION:
The Shoshone ID would like to continue the rehabilitation on the drop structures on the Garland Canal. This is a large-scale project involving 4 drop structures and a drop structure combined with a diversion. Also included are the control works on the Ralston Reservoir and the conversion of approximately 1.5 miles of open ditch to a pressurized pipeline. The district will install the pressurized pipeline and construct Garland Canal Drop #3 during the winter of 2002-2003.

RECOMMENDED LEGISLATIVE ACTION:
No Legislative action is required.

   Citizen    Government    Business    Visitor   Privacy Policy